Skip to main content
Supply-Side Opportunity

For Site Partners

CSA is actively seeking qualified U.S. landowners, developers, and site sponsors with solar-ready land at scale. If your site meets our criteria, we want to understand the opportunity — and we move deliberately on the right ones.

Supply-Side Qualifier

Check Site Qualification

Answer 8 questions and find out in under two minutes whether your site meets CSA's minimum thresholds.

Check Site Qualification
The Opportunity

A Buyer or Long-Term Partner for Your Site

CSA evaluates qualified sites for two primary outcomes: direct acquisition with institutional capital partners, or a structured long-term power purchase agreement with the existing landowner. In both cases, CSA brings the capital, development platform, and operational expertise.

You do not need to fund the buildout, manage construction, or operate the energy infrastructure. That is our role. Your contribution is the site — qualified, development-ready, and structured for a long-term commitment.

No development capex required from site partner

Institutional capital and financing

Vertically integrated build and operations

Long-term ownership alignment

What We Bring

Capital, Platform, and Long-Term Alignment

CSA is not a broker or a development-and-exit shop. We build to own and operate. Every site partner gets a long-term counterparty with aligned interests — not a developer who exits at financial close.

Development Capital

We bring project-level capital and institutional partners to qualified sites. The landowner or developer does not need to fund the energy infrastructure buildout. We underwrite, structure, and finance the project.

Integrated Development Platform

Permitting support, procurement, construction management, and commissioning are managed under one roof. No fragmented subcontractor chains or disjointed execution handoffs that introduce risk and delay.

Infrastructure-Grade Contracting

Long-term contract structures are designed for bankability and off-taker alignment. Our agreements are built to support capital planning, investor expectations, and long-duration operational commitments.

Long-Term Owner-Operator

CSA's objective is to develop, own, and operate across the full contract term with qualified partners. Your site has a long-term counterparty with structurally aligned incentives — not a developer who packages and exits.

Site Qualification

What We're Looking For

We evaluate sites against a consistent set of criteria. Sites that meet these thresholds move quickly through our qualification process. Sites that fall short in multiple areas are typically not a fit in the near term.

1,500+ Developable Acres — U.S. Only

Minimum 1,500 developable acres within the United States. Larger land positions are strongly preferred and allow greater flexibility in generation architecture and infrastructure layout.

250 MW+ Solar Generation Potential

Sites must support utility-scale solar generation of 250 MW or greater. Larger installations are preferred. Smaller projects may be evaluated individually where development economics are compelling.

Natural Gas Access

Natural gas supply must be available on site or on a credible development path. This is a non-negotiable requirement for our hybrid generation architecture.

High-Capacity Data Connectivity

Fiber or carrier-grade data connectivity must be available or achievable. This is required to support the mission-critical load profiles this platform serves.

Permitted, Entitled, or 6-Month Permit Path

Solar entitlement is a minimum requirement — sites must be entitled for solar or on a credible near-term path to solar entitlement. Shovel-ready and fully permitted sites receive priority. Without solar entitlement or a clear path to it, development timelines become uncertain and the project will not advance.

On-Site Water Access

On-site water access is preferred. For sites without viable water sources, the platform will evaluate alternative generation configurations that may support on-site water production, subject to site-specific feasibility and system design.

Existing Operating Properties

Not Just Raw Land

CSA is also open to evaluating existing operating properties — industrial campuses, data center facilities, manufacturing operations, and similar large-load environments where behind-the-meter power could support growth, reduce delivered energy cost, or address grid expansion constraints.

Same Readiness Standard Applies

The property must be capable of moving on an accelerated 6–12 month path. If significant permitting or development work remains unresolved, it is not a current investment target.

Supported Use Cases

Primary or supplemental power for existing loads. Expansion capacity for growing operations. Resilience support for mission-critical facilities. Reduced delivered energy cost through on-site generation.

Site Control Required

CSA requires a clear and stable site control pathway regardless of property type. Short-term or uncertain control positions are not workable for a structured development engagement.

If your operating property has site control, a realistic permitting path, and a need for added power capacity — we are open to an inquiry.

Honest Filters

What Does Not Advance

We are direct about what we will not pursue. This saves time for both sides and keeps our evaluation process focused on qualified opportunities.

Sites outside the United States

Sites without viable natural gas access or a credible development path to it

Sites below 1,500 acres or with solar potential under 100 MW

Sites with no entitlement or permit path achievable within six months

Landowners unwilling to commit to a long-term contractual arrangement

Projects requiring short-term, speculative, or uncertain land control structures

Deal Structures

Two Paths to Working Together

We approach qualified sites through two primary engagement models. Both require a long-term commitment aligned with project development and operations timelines. The right structure depends on the landowner's preferences, site conditions, and transaction readiness.

Site Acquisition

For landowners and developers ready to transact, CSA can pursue outright site acquisition — independently or with institutional capital partners. This path works best when the site meets all qualification criteria and the transaction structure supports development economics. We move deliberately on qualified sites and do not pursue speculative or contingent acquisitions.

Best fit: Sellers ready to transact on a qualified site

Landowner PPA Partnership

For landowners who prefer to retain ownership of the land, CSA structures long-term power purchase agreements that support full project development and operations. The landowner must be prepared to commit to a long-term contractual arrangement aligned with the full development and operations timeline. Short-term or uncertain land control positions are not workable for this structure.

Best fit: Owners retaining land, willing to commit long-term

What Happens Next

From Inquiry to Qualification

01

Submit a Site Inquiry

Use the contact form to tell us about your site — location, acreage, entitlement status, solar potential, gas and data access, and any relevant development context.

02

Initial Review

We evaluate your submission against our qualification criteria within two business days. Sites that meet the minimum thresholds proceed to a qualification conversation.

03

Qualification Discussion

If the site looks viable, we schedule a direct conversation to understand the development conditions, ownership structure, and transaction expectations in more detail.

04

Site Assessment

We conduct a formal site assessment covering entitlements, permitting, infrastructure access, solar resource quality, and development economics to confirm project viability.

05

Structure and Next Steps

If the opportunity advances, we propose a deal structure — acquisition or long-term PPA — and outline the path to executed agreements and project commencement.

Submit a Site for Review

If your U.S. site is entitled for solar, has 1,500 or more developable acres, 250 MW or greater solar potential, and natural gas access, we'd welcome a project discussion. Response within two business days.